| Station | Distance (m.) | Elevation (m.) (relative to:) | Remarks |
|---|---|---|---|
| BM 1 to BM 2 | (BM 1) | ||
| 1. | 30 | -0.09 | at BM 2 |
| 2. | 29 | -0.09 | |
| 3. | 27 | -0.30 | |
| 4. | 26 | -0.80 | |
| 5. | 26 | -1.16 | |
| 6. | 25 | -1.24 | |
| 7. | 25 | -1.71 | end vegetation |
| 8. | 24 | -1.97 | edge of water |
| 9. | 24 | -2.12 | water surface = 0.15 m. |
| 10. | 22 | -2.20 | |
| 11. | 20 | -2.16 | |
| 12. | - | -2.20 | error in readings |
| 13. | 19 | -2.24 | sinking to knees in mud |
| 14. | 18 | -2.15 | |
| 15. | 16 | -2.12 | water surface = 0.15 m. |
| 16. | 15 | -2.06 | edge of water |
| 17. | 14 | -1.67 | top of vertical bank |
| 18. | 13 | -1.52 | |
| 19. | 11 | -1.52 | |
| 20. | 8 | -0.55 | |
| 21. | 7 | -0.07 | one foot from # 20 |
| 22. | 5 | 0.06 | |
| BM 3 to BM 4 | (BM 3) | ||
| 1. | 41 | -0.05 | at BM 4 |
| 2. | 37 | -0.12 | top of cut bank |
| 3. | 37 | -1.18 | bottom of cut bank |
| 4. | 36 | -1.62 | |
| 5. | 34 | -1.78 | |
| 6. | 33 | -2.03 | edge of water and vegetation |
| 7. | 33 | -2.29 | water surface = 0.26 m. |
| 8. | 31 | -2.36 | |
| 9. | 30 | -2.34 | |
| 10. | 27 | -2.18 | water surface = 0.15 m., 0.35 m. soft mud |
| 11. | 28 | -2.13 | |
| 12. | 26 | -2.12 | water surface = 0.1 m. |
| 13. | 25 | -2.04 | edge of water and vegetation |
| 14. | 25 | -1.56 | |
| 15. | 23 | -1.35 | bankfull |
| 16. | 21 | -1.33 | |
| 17. | 17 | -1.33 | (questionable shot) |
| 18. | 13 | -1.19 | toe basin terrace riser |
| 19. | 9 | -0.06 | |
| 20. | 5 | 0.04 | |
| BM 5 to BM 6 | (BM 5) | ||
| 1. | 51 | -0.05 | at BM 6 |
| 2. | 48.5 | -0.10 | break in slope |
| 3. | 48 | -1.16 | toe of slope |
| 4. | 46 | -1.65 | bankfull |
| 5. | 45 | -1.98 | |
| 6. | 44 | -2.16 | edge of water |
| 7. | 42 | -2.29 | water surface = 0.205 m. |
| 8. | 42 | -2.36 | vegetation clump in middle of stream |
| 9. | 40 | -2.40 | vegetation clump in middle of stream |
| 10. | 38 | -2.30 | vegetation clump, depth of water = 0.05 m. |
| 11. | 38 | -2.15 | water edge |
| 12. | 37 | -1.78 | break in slope |
| 13. | 35 | -1.60 | estimated bankfull stage? |
| 14. | 29 | -1.27 | |
| 15. | 23 | -1.11 | |
| 16. | 15 | -0.78 | |
| 17. | 9 | -0.67 | toe of terrace |
| 18. | 5 | -0.12 | top of terrace |