The Desert Laboratory

The Vigil Network
Armells Creek: Table 1-2 - Cross Sections

Data Files:


Station Distance (m.) Elevation (m.) (relative to:) Remarks
BM 1 to BM 2 (BM 1)
1. 30 -0.09 at BM 2
2. 29 -0.09
3. 27 -0.30
4. 26 -0.80
5. 26 -1.16
6. 25 -1.24
7. 25 -1.71 end vegetation
8. 24 -1.97 edge of water
9. 24 -2.12 water surface = 0.15 m.
10. 22 -2.20
11. 20 -2.16
12. - -2.20 error in readings
13. 19 -2.24 sinking to knees in mud
14. 18 -2.15
15. 16 -2.12 water surface = 0.15 m.
16. 15 -2.06 edge of water
17. 14 -1.67 top of vertical bank
18. 13 -1.52
19. 11 -1.52
20. 8 -0.55
21. 7 -0.07 one foot from # 20
22. 5 0.06
BM 3 to BM 4 (BM 3)
1. 41 -0.05 at BM 4
2. 37 -0.12 top of cut bank
3. 37 -1.18 bottom of cut bank
4. 36 -1.62
5. 34 -1.78
6. 33 -2.03 edge of water and vegetation
7. 33 -2.29 water surface = 0.26 m.
8. 31 -2.36
9. 30 -2.34
10. 27 -2.18 water surface = 0.15 m., 0.35 m. soft mud
11. 28 -2.13
12. 26 -2.12 water surface = 0.1 m.
13. 25 -2.04 edge of water and vegetation
14. 25 -1.56
15. 23 -1.35 bankfull
16. 21 -1.33
17. 17 -1.33 (questionable shot)
18. 13 -1.19 toe basin terrace riser
19. 9 -0.06
20. 5 0.04
BM 5 to BM 6 (BM 5)
1. 51 -0.05 at BM 6
2. 48.5 -0.10 break in slope
3. 48 -1.16 toe of slope
4. 46 -1.65 bankfull
5. 45 -1.98
6. 44 -2.16 edge of water
7. 42 -2.29 water surface = 0.205 m.
8. 42 -2.36 vegetation clump in middle of stream
9. 40 -2.40 vegetation clump in middle of stream
10. 38 -2.30 vegetation clump, depth of water = 0.05 m.
11. 38 -2.15 water edge
12. 37 -1.78 break in slope
13. 35 -1.60 estimated bankfull stage?
14. 29 -1.27
15. 23 -1.11
16. 15 -0.78
17. 9 -0.67 toe of terrace
18. 5 -0.12 top of terrace

Return to top of page