The Desert Laboratory

The Vigil Network
Last Day Gully: Table 16 - Cross-Sectional Survey of Ground-Surface Elevation and Erosion, in Feet, Station E-D

Data Files:


[See explanation of column headings]

Distance from LB BM Elevation Erosion, Aug. 1962 -
Aug 1962 June 1963 July 1965 June 1966
0 (BM-E) 115.46 - - -
0.0 114.82 0.040 0.050 0.050
5.0 113.91 0.010 0.010 0.010
10.01 112.53 0.060 0.085 0.120
12.0 111.71 0.070 0.090 0.140
14.0 110.45 0.060 0.090 0.100
16.02 109.36 0.180 0.520 0.630
16.7 108.73 - - -
17.0 107.78 - - -
18.03 107.23 -0.020 -0.220 -0.260
19.5 107.39 - - -
20.0 107.79 0.230 0.180 0.095
22.0 108.51 - -.230 -0.230
24.0 109.66 - 0.000 0.000
24.2 110.09 - - -
26.0 110.45 0.015 0.020 0.020
28.0 110.84 0.040 0.040 0.040
30.0 111.17 0.010 0.000 0.000
35.0 111.54 0.000 0.005 -0.005
40.0 111.40 0.000 0.005 0.005
45.0 111.52 0.000 -0.005 -0.005
50.0 111.77 0.015 0.035 0.020
55.0 112.30 0.010 0.005 0.005
60.0 111.78 0.020 0.035 0.035
65.0 111.09 0.015 -0.005 -0.005
70.0 110.37 0.025 0.020 0.020
75.0 110.05 0.025 0.015 0.015
80.0 110.66 0.000 -0.025 -0.025
85.0 111.13 0.010 0.015 0.015
90.0 111.38 0.000 0.010 0.000
95.0 112.08 0.010 -0.005 -0.005
100.0 113.40 0.020 0.030 0.030
105.0 114.58 0.000 -0.015 -0.015
110.0 116.22 -0.025 -0.060 -0.060
112.0 116.98 0.000 0.010 0.010
114.0 117.63 0.000 0.010 0.010
116.0 117.97 0.015 0.020 0.020
118.0 118.44 0.020 0.080 0.080
120.0 118.85 0.000 0.005 0.025
120 (BM-D) 119.16 - - -

1Channel wall.
2Steep bank.
3Channel bed.

Return to top of page