The Desert Laboratory

The Vigil Network
Main Stem Rosebud Creek: Table 2 - Cross Sections

Data Files:


Station Distance (m) Elevation (m) (relative to:) Remarks
BM 1 to BM 2 (BM 1)
1. 29.9 -0.17 at BM 2
2. 28.9 -0.23 top of terrace
3. 27.99 -0.53
4. 27.79 -1.51 toe of terrace
5. 26.19 -1.47 estimated bankfull stage, undercut approx. 0.08 m.
6. 26.00 -2.70 water surface = 0.80 m.
7. 25.3 -2.51 undercut 0.3 m.
8. 24.9 -2.34
9. 22.71 -1.44 estimated bankfull stage
10. 22.51 -1.29
11. 21.61 -1.03 gradual slope up to BM 1
12. 20.52 -0.91
13. 17.33 -0.66
14. 10.66 -0.27
15. 5.28 -0.17
16. 2.0 -0.08
17. 0.0 0.0 at BM 1
BM 1 to BM 3 (BM 1)
1. 30.2 -0.23 at BM 3
2. 30.7 0.05 back to plowed field
3. 28.19 -0.53
4. 26.59 -0.79
5. 25.0 -0.94
6. 24.4 -1.18 estimated bankfull stage
7. 23.21 -1.87 edge of water
8. 23.00 -2.52 water surface = 0.63 m.
9. 22.61 -2.33
10. 22.11 -1.65 on slump - undercut 0.1 m.
11. 21.42 -1.29 estimated bankfull stage
12. 20.82 -1.23
13. 20.62 -1.04
14. 19.92 -0.95 toe of terrace
15. 18.82 -0.61
16. 17.82 -0.27 top of terrace
17. 13.65 -0.10
18. 9.36 -0.12
19. 5.48 -0.03
20. 1.85 0.03
BM 4 to BM 5 (BM 4)
1. 15.26 -0.31 at BM 5
2. 13.77 -0.74
3. 17.0 0.15 back to plowed field
4. 12.6 -0.98
5. 10.75 -1.21
6. 10.26 -1.45 estimated bankfull stage
7. 8.7 -1.96 edge of water
8. 8.5 -2.26 water surface = 0.63 m.
9. 8.11 -2.17
10. 7.62 -1.94 edge of water
11. 7.03 -1.38 estimated bankfull stage
12. 6.25 -1.09
13. 5.76 -0.98 toe of terrace
14. 4.98 -0.45
15. 3.52 -0.08 top of terrace

Return to top of page