| Station | Distance (m) | Elevation (m) (relative to:) | Remarks |
|---|---|---|---|
| BM 1 to BM 2 | (BM 1) | ||
| 1. | 29.9 | -0.17 | at BM 2 |
| 2. | 28.9 | -0.23 | top of terrace |
| 3. | 27.99 | -0.53 | |
| 4. | 27.79 | -1.51 | toe of terrace |
| 5. | 26.19 | -1.47 | estimated bankfull stage, undercut approx. 0.08 m. |
| 6. | 26.00 | -2.70 | water surface = 0.80 m. |
| 7. | 25.3 | -2.51 | undercut 0.3 m. |
| 8. | 24.9 | -2.34 | |
| 9. | 22.71 | -1.44 | estimated bankfull stage |
| 10. | 22.51 | -1.29 | |
| 11. | 21.61 | -1.03 | gradual slope up to BM 1 |
| 12. | 20.52 | -0.91 | |
| 13. | 17.33 | -0.66 | |
| 14. | 10.66 | -0.27 | |
| 15. | 5.28 | -0.17 | |
| 16. | 2.0 | -0.08 | |
| 17. | 0.0 | 0.0 | at BM 1 |
| BM 1 to BM 3 | (BM 1) | ||
| 1. | 30.2 | -0.23 | at BM 3 |
| 2. | 30.7 | 0.05 | back to plowed field |
| 3. | 28.19 | -0.53 | |
| 4. | 26.59 | -0.79 | |
| 5. | 25.0 | -0.94 | |
| 6. | 24.4 | -1.18 | estimated bankfull stage |
| 7. | 23.21 | -1.87 | edge of water |
| 8. | 23.00 | -2.52 | water surface = 0.63 m. |
| 9. | 22.61 | -2.33 | |
| 10. | 22.11 | -1.65 | on slump - undercut 0.1 m. |
| 11. | 21.42 | -1.29 | estimated bankfull stage |
| 12. | 20.82 | -1.23 | |
| 13. | 20.62 | -1.04 | |
| 14. | 19.92 | -0.95 | toe of terrace |
| 15. | 18.82 | -0.61 | |
| 16. | 17.82 | -0.27 | top of terrace |
| 17. | 13.65 | -0.10 | |
| 18. | 9.36 | -0.12 | |
| 19. | 5.48 | -0.03 | |
| 20. | 1.85 | 0.03 | |
| BM 4 to BM 5 | (BM 4) | ||
| 1. | 15.26 | -0.31 | at BM 5 |
| 2. | 13.77 | -0.74 | |
| 3. | 17.0 | 0.15 | back to plowed field |
| 4. | 12.6 | -0.98 | |
| 5. | 10.75 | -1.21 | |
| 6. | 10.26 | -1.45 | estimated bankfull stage |
| 7. | 8.7 | -1.96 | edge of water |
| 8. | 8.5 | -2.26 | water surface = 0.63 m. |
| 9. | 8.11 | -2.17 | |
| 10. | 7.62 | -1.94 | edge of water |
| 11. | 7.03 | -1.38 | estimated bankfull stage |
| 12. | 6.25 | -1.09 | |
| 13. | 5.76 | -0.98 | toe of terrace |
| 14. | 4.98 | -0.45 | |
| 15. | 3.52 | -0.08 | top of terrace |