North Tippah Creek: Comparison of Channel Sections Before and After 1963 Straightening

Data Files:


Comparison of North Tippah channel sections at sedimentation ranges with nearest sections taken just before and after 1963 channel straightening.

Date and location Top width (feet) Bottom width (feet) Depth (feet) Cross section (square feet)
1939 Range 1 (nr. Sta. 344+00) 30 12 8.0 195
1961 Sta. 345+00 43 19 7.2 227
1964 Not surveyed-not dredged - - - -
1969 Range 1 42 8 13.0 355
1939 Range 2 (nr. Sta. 269+00) 65* 26 8.6 433
1961 Sta. 265+00 47 20 8.7 289
1963 Sta. 268+00, constr. stakes 51 14 8.6 229
1964 Sta. 265+00, As Built 36 20 9.6 272
1969 Range 2 67* 26 9.5 493
1939 Range 3 (nr. Sta. 147+00) 47** 18** 10.0 318
1962 Sta. 151+50 32 13 7.4 143
1964 Sta. 150+00, As Built 49 28 10.5 403
1964 Sta. 145+00, As Built 48 28 9.2 420
1969 Range 3 59 27 12.1 570
1939 Range 4 (old channel) 41 27 10.1 305
1961-1962 Not surveyed - - - -
1964 Sta. 55+00, As Built*** 54 32 10.5 445
1969 Range 4 (nr. Sta. 54+00)*** 76 26 11.4 670

* The greater channel width at Range 2, both in 1939 and 1969, makes it doubtful whether valid comparisons can be made with the nearest available sections taken just before and after channel straightening.

** Width only 37 and 8 feet according to survey notes, but comparison with 1969 survey suggests 10 feet error.

*** New channel.